Project
Value Year
1. T/A 2009 Repaint pipe line 04C001 EBSM 2,500,000.00
2. T/A2009 LDU Plant 1,100,000.00
3. T/A2009 Complex 3 18,423,000.00
4. T/A2009 LCP 3,343,000.00
5. Re-paint piping Rack and change Insulation at PW Plant Repaint & Repair Hot/Cold G-12 to D303 and change 4” NL 27,000,000.00 2009
6. Repaint and Repair Work No.69T001 /69T025D 16,360,422.75 2009
7. Cut and Re welding coils of F0101 & F0601 for Shutdown Furnace at ETP 2,606,376.63 2009
8. Cut and rewelding coils of F0401 & F0301 2,074,850.38 2009
9. Repair pipe line for T/A 2011 at Power Plant 3,972,765.16 2011
10. Repair Piping for TA2011 Complex 4 15,191,107.00 2011
11. TA 2011 Complex 3 13,052,647.45 2011
12. Clean inside tank no.69T071 for TA 2011 at TFLT plant 1,944,000.00 2011
13. Repair Tube sheet of 15E003A,B,C at DK Plant 5,296,500.00 2011
14. Repair pipe line for TA 2011 at TFLL plant 5,555,400.00 2011
15. Sandblast Confire Copper Tandk 80T002 Addition work for T/A 2011 2,839,512.00 2011
16. Coating Bottom Plate Tank 80T002 Addition work for T/A 2011 3,711,296.00 2011
17. Addition work T/A 2011 for Complex 3 16,000,000.00 2011

 